Location: Whitehall, OH
Problem: 5 breakdowns in one winter! Leaky pumps and valve issues. Boiler was estimated 50-60% efficient, causing high gas bills. Poor output from old 10-ton AC. Noisy old belt-driven air handler.
Solution: Replaced single zone boiler with two 90% efficient gas furnaces and two 5-ton AC units staged for better control during occupied/vacant times. Air flow is now quiet, and access to components vastly improved.
